Large-diameter welded pipe production process

Large-diameter welded pipe production process

1: Conduct physical and chemical inspections of raw materials such as strip steel coils, welding wires, and fluxes.

2: The head-to-tail butt joint of the strip steel adopts single-wire or double-wire submerged arc welding, and automatic submerged arc welding is used for repair welding after being rolled into steel pipes.

3: Before forming, the strip is leveled, trimmed, planed, surface cleaned, transported, and pre-bent.

4: Use the electric contact pressure gauge to control the pressure of the oil cylinders on both sides of the conveyor to ensure the smooth conveying of the strip.

5: Use external control or internal control roll forming.

6: The weld gap control device is used to ensure that the weld gap meets the welding requirements and that the pipe diameter, misalignment, and weld gap are strictly controlled.

7: Both internal and external welding use the American Lincoln welding machine for single-wire or double-wire submerged arc welding, to obtain stable welding quality.